The landing, Op. Huskey
Sicily, 10th July 1943

THE PLAN

The allied plan was in five phases:

  • Phase 1. Preparatory measures by Naval and Air Forces to neutralise enemy naval efforts and to gain air superiority.
  • Phase 2. Pre dawn sea borne assaults, assisted by airborne landings with the object of seizing airfields and the ports of Syracuse and Licata.
  • Phase 3. The establishment of a firm base from which to conduct operations for the capture of the ports of Augusta and Catania and the Gerbini group of airfields.
  • Phase 4. The capture of the ports and airfields outlined in Phase 3.
  • Phase 5. The reduction of the island.

The main amphibious landings involved three British divisions and the Canadian Division in the east, and two US divisions in the west, all supported by heavy off shore fire from warships.

On the east side 13th Corps would land two divisions (5th and 50th) to capture Siracusa. Two Divisions of 30th Corps were to land on the south east corner, the 1st Canadians on the left (west) and 51st Highland Division on the right on the Pachino Peninsula.

THE DIVISIONAL DEPLOYMENT

The 51st Highland Division would land at the southeast tip of the island near Pachino on a four battalion frontage.

The landing was lead by 154 Brigade divided into two ? the main part of the Brigade and 1st Gordon's Group.

154 Bde - 1st Black Watch, 7th Black Watch, 7th Argylls, 11th R.H.A., 50th Royal Tanks (minus two squadrons), two companies 1/7th Middlesex (machine guns), 244 Field Company R.E., 176 Field Ambulance and other administrative and logistic elements.

1st Gordons Group - 1st Gordons, 456 Battery R.A., one squadron of 50th royal Tanks, "C" company 1/7th Middlesex, 275 Field Company R.E., 174 field ambulance and other administrative and logistic elements.

THE DIVISIONAL TASK

The 51st Highland Division was tasked with capturing Pachino and then advance on the Noto-Avola road to relieve 50th Division, part of 13 Corps. They were then to continue the advance towards Viccini.

Men walking ashore, Sicily, July 1943

The Landing, Sicily

show info

Description:

Men walking ashore, Sicily, 10th July 1943

Copyright:

Queens Own Highlanders Museum

Tags:

1943 . Queen's Own Cameron Highlanders . Sicily - Op. Huskey

THE LANDING

They landed on 10 July, largely unopposed, and pressed in land to secure the bridgehead. The 7th Argylls lead the way landing on the beach at 0245 hrs on 10 July. They had no opposition and advanced inland to Pachino in the first 24 hours and moved on to Nota which they reached on the evening of the 12th July. From there they moved to a position 12 miles north near Palazzolo.

"C" Company of 7th Black Watch got on the correct beach but the rest of the Battlion were landed in the wrong place and it was not until 0615 that the Battalion was ready to advance, but by 0700hrs they had taken their objectives.

1st Black Watch, the reserve battalion, landed without opposition.

1st Gordons Group objectives were Capo Paassero island and the village of Portopala, a tunny factory, light house and a ridge beyond dominating the approach to Pachino. By 0900hrs they were on the ridge.

AFTERMATH

Despite one or two problems the other landings all succeeded, opposition was light and 154 Brigade established the bridgehead. 153 Brigade started to land at 0630 hrs and passed through 154 Brigade. 152 Brigade and the Divisional Tactical HQ also landed without opposition. The advance north now began.